Tepco

User avatar
Pigeon
Posts: 18065
Joined: Thu Mar 31, 2011 3:00 pm

Re: Tepco

Post by Pigeon » Sat Apr 09, 2011 4:52 am

Damaged reactors at the crippled Fukushima Dai-Ichi nuclear plant may take three decades to decommission and cost operator Tokyo Electric Power Co. more than 1 trillion yen ($12 billion), engineers and analysts said. Relatedly, Japanese officials and power plant operators are now working on the problems involved with disposing of 55,000 tons of radioactive water. '... international law forbids Japan from dumping contaminated water into the ocean if there are viable technical solutions available later. So the plant operator is considering bringing in barges and tanks, including a so-called megafloat that can hold about 9.5 megalitres. Yet even using barges and tanks to handle the water temporarily creates a future problem of how to dispose of the contaminated vessels.

Link


User avatar
anarch
Posts: 167
Joined: Thu Apr 07, 2011 2:20 am

Re: Tepco

Post by anarch » Sat Apr 09, 2011 5:50 am

Thermals of reactor 2 & 3

R2.

Image

R3

Image

Post Reply